Discover projects
NSIDE Project

CHESTER ROAD DEVELOPMENT

Warrington Housing Association

Connolly’s contracted with GSL to design and install a full Mechanical and Electrical (M&E) Package.
Location
Connolly’s
Walkthrough Video

Four 2-bedroom self-contained flats were delivered on time and more importantly on budget and have since been rented.

Warrington Housing Association

Background

Connolly’s contracted with GSL to design and install a full Mechanical and Electrical (M&E) Package.The project consisted of converting 2 Victorian houses in the village of Stockton Heath into 4 self-contained 2-bedroom flats.The plumbing works consisted of new central heating system with Vaillant Boilers, the plumbing package included level access walk in showers.The electrical package included full re-wires new lighting, sub mains and intruder alarms.

Results

Four 2-bedroom self-contained flats were delivered on time and more importantly on budget and have since been rented.

What we did
wigan

DOMESTIC PV BATTERY STORAGE

11.20.21
Connolly’s

THE GATEWAY OFFICE REFURB

1.2.22
Warrington & St Helens

TORUS 62 BOILER UPGRADES

10.29.20